Invitation to Bid
Project Name/Location | Contract No | Brief Description of Work | ABC | Project Duration | Attachment File/s |
---|---|---|---|---|---|
LASECAM SIP | LMC-SIP-LASECAM-2019-RO |
Construction of Diversion Dam, Canal Structures |
45,815,400.00 | 210 |
![]() |
SIMULAO RIS | NISRIPD-C-9C-R |
IRRIGATION ASPECT (STA.3+166-STA.6+790) |
35,531,500.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9B-R |
IRRIGATION ASPECT AND DAM ASPECT INCLUDING MECHANICAL WORKS (STA.0+000-STA.3+151) |
39,059,400.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9E |
IRRIGATION ASPECT INCLUDING MECHANICAL WORKS (STA.10+221-STA.14+628) |
37,258,300.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9D |
IRRIGATION ASPECT INCLUDING MECHANICAL WORKS (STA.6+988-STA.10+183) |
25,702,700.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9C |
IRRIGATION ASPECT (STA.3+166-STA.6+790) |
35,531,500.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9B |
IRRIGATION ASPECT AND DAM ASPECT INCLUDING MECHANICAL WORKS (STA.0+000-STA.3+151) |
39,059,400.00 | 146 |
![]() |
SIMULAO RIS | NISRIPD-C-9A |
CONSTRUCTION OF IA OFFICE FACILTIES (16 UNITS) |
23,531,400.00 | 146 |
![]() |
MAT-I MAGOS SIP | MAT-I MAGOS SIP-01-2018-RO |
Construction of Diversion Works |
36,514,000.00 | 240 |
![]() |
STA.JOSEFA PIS | LMC-2018-QRF-SJPIS-001-RO |
Repair/Rehab of Irrigation Facilities |
4,296,410.00 | 90 |
![]() |
BACAY SIP | LMC-2018-BACAY SIP-001-RIO-R |
Diversion Works and Canalization |
69,544,600.00 | 240 |
![]() |
STA. JOSEFA PIS | LMC-02-SJPIS-MATERIALS-2018 |
Supply and Delivery of Sand and Gravel |
1,390,730.00 | 120 |
![]() |
Volvo Hydraulic Excavator | R-008-2018-R |
Supply Labor and Materials for the Complete Repair of Electrical and Electronic System Back to Operational Condition (Volvo Hydraulic Excavator EC210B) |
1,500,000.00 | 30 |
![]() |
STA. JOSEFA PIS | LMC-01-SJPIS-MATERIALS-2018 |
Supply and Delivery of Construction Materials |
5,306,820.00 | 180 |
![]() |
Libang RIP | DE- LIBANG RIP-01-2017-R |
Detailed Engineering |
9,700,000.00 | 120 |
![]() |
Malihaw SRIP | FS- MALIHAW SRIP -02-17-R |
Feasibility Study |
6,954,000.00 | 180 |
![]() |
Tago RIS | FS- TAGO RIS -01-17-R |
Feasibility Study |
10,503,000.00 | 180 |
![]() |
Volvo Hydraulic Excavator | R-008-2018 |
Supply Labor and Materials for the Complete Repair of Electrical and Electronic System Back to Operational Condition (Volvo Hydraulic Excavator EC210B) |
1,500,000.00 | 30 |
![]() |