Invitation to Bid

Project Name/Location Contract No Brief Description of Work ABC Project Duration Attachment File/s
LASECAM SIP LMC-SIP-LASECAM-2019-RO

Construction of Diversion Dam, Canal Structures

45,815,400.00 210 PDF icon lasecam and tago.pdf
SIMULAO RIS NISRIPD-C-9C-R

IRRIGATION ASPECT (STA.3+166-STA.6+790)

35,531,500.00 146 PDF icon NISRIP ITB new.pdf
SIMULAO RIS NISRIPD-C-9B-R

IRRIGATION ASPECT AND DAM ASPECT INCLUDING MECHANICAL WORKS (STA.0+000-STA.3+151)

39,059,400.00 146 PDF icon NISRIP ITB new.pdf
SIMULAO RIS NISRIPD-C-9E

IRRIGATION ASPECT INCLUDING MECHANICAL WORKS (STA.10+221-STA.14+628)

37,258,300.00 146 PDF icon NISRIP ITB.pdf
SIMULAO RIS NISRIPD-C-9D

IRRIGATION ASPECT INCLUDING MECHANICAL WORKS (STA.6+988-STA.10+183)

25,702,700.00 146 PDF icon NISRIP ITB.pdf
SIMULAO RIS NISRIPD-C-9C

IRRIGATION ASPECT (STA.3+166-STA.6+790)

35,531,500.00 146 PDF icon NISRIP ITB.pdf
SIMULAO RIS NISRIPD-C-9B

IRRIGATION ASPECT AND DAM ASPECT INCLUDING MECHANICAL WORKS (STA.0+000-STA.3+151)

39,059,400.00 146 PDF icon NISRIP ITB.pdf
SIMULAO RIS NISRIPD-C-9A

CONSTRUCTION OF IA OFFICE FACILTIES  (16 UNITS)

23,531,400.00 146 PDF icon NISRIP ITB.pdf
MAT-I MAGOS SIP MAT-I MAGOS SIP-01-2018-RO

Construction of Diversion Works

36,514,000.00 240 PDF icon MAGOS SIP.pdf
STA.JOSEFA PIS LMC-2018-QRF-SJPIS-001-RO

Repair/Rehab of Irrigation Facilities

4,296,410.00 90 PDF icon QRF-SJPIS-.pdf
BACAY SIP LMC-2018-BACAY SIP-001-RIO-R

Diversion Works and Canalization

69,544,600.00 240 PDF icon bacay.pdf
STA. JOSEFA PIS LMC-02-SJPIS-MATERIALS-2018

Supply and Delivery of  Sand and Gravel

1,390,730.00 120 PDF icon LMC-02-SJPIS-MATERIALS-2018.pdf
Volvo Hydraulic Excavator R-008-2018-R

Supply Labor and Materials for the Complete Repair of Electrical and Electronic System Back to Operational Condition (Volvo Hydraulic Excavator EC210B)

1,500,000.00 30 PDF icon volvo and sta josefa.pdf
STA. JOSEFA PIS LMC-01-SJPIS-MATERIALS-2018

Supply and Delivery of Construction Materials

5,306,820.00 180 PDF icon volvo and sta josefa.pdf
Libang RIP DE- LIBANG RIP-01-2017-R

Detailed Engineering

9,700,000.00 120 PDF icon malihaw tago and 1 other.pdf
Malihaw SRIP FS- MALIHAW SRIP -02-17-R

Feasibility Study

6,954,000.00 180 PDF icon malihaw tago and 1 other.pdf
Tago RIS FS- TAGO RIS -01-17-R

Feasibility Study

10,503,000.00 180 PDF icon malihaw tago and 1 other.pdf
Volvo Hydraulic Excavator R-008-2018

Supply Labor and Materials for the Complete Repair of Electrical and Electronic System Back to Operational Condition (Volvo Hydraulic Excavator EC210B)

1,500,000.00 30 PDF icon volvo new.pdf

Pages